About the Candidate
Role: Project / Bid Director
Company: Dragados
Education: B.Sc. in Industrial Engineering
Galatasaray University, Istanbul – Turkey, 2002
Languages: English, French, Turkish
Experience: 20 years
I am a bilingual Project/ Bid Director with more than 20 years of experience in leading large multinational construction projects from proposal through to handover. In particular, in the last 8 years I have led the bidding, construction, handover, and close out of several railway projects, including two tramway systems, all in French-speaking countries. I was the Project Director for the realization of 15-kilometre tramway project in Sétif, Algeria, that included infrastructure works, systems integration, utility relocation as well as extensive urban development – façade to façade – along the route to integrate the new tramway into the cityscape. Additionally, I oversaw the post-construction periods of this project, and that of another 14-kilometre tramway project. I also led the successful proposals for a metro line extension project and a mainline railway project in Algeria, and several other railway, rapid bus transit, and tunnelling projects.
My project experience spans leading commercial and contract negotiations, local subcontractor selection and management, local compliance, logistics and procurement organization, project controls, project and construction management, stakeholder relations, permitting, commissioning, handover, and close out. I have worked with different contract/delivery models, including EPC. The projects that I have worked on included substantial architectural, engineering, and urban development scopes, and have gained solid skills in integrating and managing multidisciplinary and multinational project teams. Moreover, my experience in each phase of a project lifecycle allows me to be an effective collaborator with clients, engineers, consultants, and subcontractors to ensure projects are delivered on time and on budget.
Role: Bid Director
Employer: Dragados Canada, Inc.
Location: Montreal, QC
From 2020 to 2022
Since joining Dragados Canada, I have been involved in the following major pursuits:
Acting Bid Director – Québec City Tramway, City of Québec, DBFOM
· Assisting in the development of commercial and technical pre-bid strategies, and in particular in the development of the bid management organization.
Bid Director for the following RFQ submissions
– Power Downtown Tunnel, Toronto, Bid-Build
– Île aux Tourtes Bridge, Québec, Design-Build-Finance
Bid Director – Contrecœur Container Terminal, Montréal, Design-Build-Finance
· Assisted the development of the project management and construction approaches for the successful RFQ submission.
Role: Bid Director and Post-construction Project Director
Employer: Yapi Merkezi
Location: Istanbul, TR
From 2018 to 2020
Bid Director
· Led business development and proposals for railway projects in French-speaking countries in Africa:
o Metro line connecting Ain Naadja to Baraki in Algiers, Algeria
o Railway projects in Algeria on the Annaba-Djebel Onk mining line
o High-speed train line project in Tunisia
o Bus rapid transit project in Dakar, Senegal
· Led the bid for the construction of TBM tunnels in a rapid railway transit system project between Delhi and Meerut (Package no.08) in India.
· Led business development efforts for potential new projects in Sweden and Canada.
Post-Construction Project Director
· Oversaw the post-construction management of the Sidi Bel Abbes Tramway project in Algeria during its guarantee period. I led the negotiations with the client on outstanding commercial issues and coordinated the resolution of deficiencies. This EPC project includes 14 km of double track tramway line with a maintenance and operation centre including administration, workshop, and storage buildings, and a depot yard.
· Oversaw the post-construction management of the Sétif Tramway project in Algeria during its guarantee period. I led the negotiations with the client on outstanding commercial issues and coordinated the resolution of deficiencies. This EPC project includes 15 km of double track tramway line with a maintenance and operation centre including administration, workshop, and storage buildings, and a depot yard.
My achievements include:
· Submitting the winning proposals for the construction of the mining railway line (Annaba-Djebel Onk Package No.02) and the extension project of the metro line in Algiers (from Ain Naadja to Baraki).
Role: Project Director, Setif Tramway Project, 450M$
Employer: Yapi Merkezi&Alstom JV
Location: Setif, Algeria
From 2014 to 2018
As Project Director on the $453M tramway project (EPC), I was responsible for:
· Managing and coordinating technical, financial, and contractual negotiations with the client (local transit authority Entreprise Métro Alger) and its engineering consultant (Yuksel), system partner of the consortium (Alstom), engineering companies (Systra for the track and urban development design and TEC4 for the design of maintenance and operation center and engineering structures), external and technical control companies, independent certification organization (Certifer), concessionaires, local authorities as well as the operation and maintenance teams.
· Realization of the tramway infrastructure works, systems integration, and urban development along the route, which included building renovations and modifications, green and public spaces.
· Selection and management of local subcontractors.
· Incorporating snow and winter conditions considerations for maintenance and construction in the design and technical solution.
· Leading the mobilization period and oversaw the establishment of local and site offices.
· Overseeing the permitting, coordination, and relocation of 30 km of utilities.
· Overseeing construction of 15 km of double track railway platform along with a maintenance and operation centre (including administration, workshop, and storage buildings, and depot yard), one bridge, 24 passenger stations, park and ride sites, 1 high voltage station, 11 electrical substations, and ticket, administrative and commercial offices.
· Defining material and equipment needs and labor requirements, managing and controlling the budget and schedule of the project.
· Identifying and negotiating contract variations and claims.
My achievements include:
· This complex project with more than 1500 workers was completed on time and on budget, which was a big achievement for the local transit authority.
Role: Deputy Project Manager, Reutov Shopping Center, 113M$, FIDIC Yellow Book
Employer: Renaissance Construction
Location: Moscow, Russia
From 2013 to 2013
As the Deputy Project Director on the Reutov Park Shopping Centre (95,000 m2), I was responsible for:
· Managing the development of the site, creating two parking floors of 1,000 spaces total and four floors of retail shops, fast food restaurants, ten cinema halls, and administrative space.
· Acting as lead on activities relating to civil and architectural works, coordination of fit-out for tenant spaces, and technical office operations.
· Managing the project schedule and workflow, ensuring tasks were completed on time and within budget.
· Managing design, project control, budget planning, financial reporting, logistics coordination, and procurement.
My achievements include:
Successfully completing the project within a tight schedule, less than a year, despite winter conditions.
Role: Deputy Bid Manager
Employer: ENKA
Location: Istanbul, TR
From 2012 to 2013
As Deputy Bid Director, I was responsible for:
· As part of a consortium, directing the bids for several American embassy construction projects, including the American Institute in Taipei, Taiwan; new embassy compounds in Benin, Cotonou; Swaziland; Moscow; and Riyad.
· Travelled onsite to perform investigations, participated in project meetings, liaised with local construction companies, and conducted research on potential subcontractors to determine best fit for project needs.
· Attending kick-off meetings to acquire data, performing investigations on local country conditions, company registration procedures, tax laws, and labor regulations to facilitate the development of strategy, including determining labor requirements, logistics, materials, and prices of same.
· Produced reports for the company board on construction and resourcing strategies to receive approval to initiate proposals
My achievements include:
· Developed the successful proposal for the Moscow embassy compound.
Role: Business Manager
Employer: ENKA
Location: Santo Domingo, Dominican Republic
From 2010 to 2012
As the Business Manager of the $188M project, my duties and responsibilities included:
· Managing project controls – planning, cost control, budgeting – and assisting the project management activities in planning, budgeting, and cost control.
· Serving as lead for mobilization process, overseeing execution of all related activities, first on the ground for the company to arrange logistics, building of camp.
· Collaborating with third-party legal advisors to ensure accounting systems and HR policies and procedures complied with local laws and regulations.
· Presenting project financials to headquarter on monthly basis, creating targeted recommendations for improvements.
· Acting as project controls lead, supporting project management activities and generating the schedule of works, estimates, forecasts, and payment schedules while also preparing, controlling, and monitoring cash flow.
My achievements include:
· Acting as project controls lead, supporting project management activities and generating the schedule of works, estimates, forecasts, and payment schedules while also preparing, controlling, and monitoring cash flow.
Role: Project Controls Manager, Eurasia Tower Project, $280M, FIDIC Red Book
Employer: ENKA
Location: Moscow, Russia
From 2007 to 2010
As Deputy Project Director for the 72-floor business complex construction project ($280M, FIDIC Red Book, shell and core, at that time the tallest building in the city), I was responsible for:
· Managing the project schedule and workflow planning, ensuring tasks were completed on time and within budget.
· Directing the prequalification process for subcontractors, identifying requirements, developing detailed plans of action, and executing negotiations to set contract and commercial requirements.
· Producing monthly financial reports, presenting findings and recommendations to upper management.
My achievements include:
· Providing assistance to headquarters during the claiming process for the work suspension spanning from 2009 to 2010 in the aftermath of the 2008 financial crisis.
Further relevant experience:
§ Project Control Supervisor, Consortium “ENKA & Degrémont”, Water Treatment Plant, Constant., Algeria, 2005-2007
§ Reporting Engineer, TAV & Holdings Company JV, Airport Project, Cairo, Egypt, 2004 – 2005
§ Quality Control Engineer, CIMTASNBO-ENKA Steel Processing Co. Ltd., Ningbo, China, 2003 – 2004
Share
Facebook
X
LinkedIn
Telegram
Tumblr
Whatsapp
VK
Mail